Case Study · Core & Shell

Rameshwar Sky

BlueWing delivered the Core & Shell construction of this 5-block, multi-storey development. The work took in a waterlogged foundation, an 18,200 sq.ft. basement and fast-track structural work across G + 12 floors.

Completed · July 2025 Residential Mar 2023 – Jul 2025
5Blocks built at the same time
B + G + 12Floors per block
3.5 LakhSq.ft. built-up area (approx.)
18,200Sq.ft. basement (approx.)
₹12.59 CrProject value (approx.)
Rameshwar Sky, the five completed blocks

Project film

Rameshwar Sky, from excavation to Core & Shell

BlueWing · 2023 – 2025

Project Overview

A large-scale, multi-block development, delivered end to end.

Rameshwar Sky is a 5-block multi-storey development. Each block has 1 basement, a ground floor and 12 upper floors, for a total built-up area of approximately 3.50 lakh sq.ft.

BlueWing Design and Construction Pvt. Ltd. carried out the Core & Shell construction works. This covered major RCC work, foundations, the basement, retaining walls, shuttering and structural construction.

The project needed careful planning, a fast-track construction method, good resource management, strict quality control and coordination across several work fronts at once.

Discuss a similar project

Key Project Challenges

Difficult ground, five work fronts and a tight pace.

Each challenge needed a solution suited to this site. The photos are from the site during construction.

Dewatering and foundation-bed preparation in the waterlogged area
01

Waterlogged foundation area

The basement foundation area was waterlogged, which made excavation and foundation preparation difficult.

SolutionThe team carried out dewatering and prepared the foundation bed, then laid rubble soling to give a stable base for the RCC foundation works that followed.
Expertise demonstratedFoundation work in difficult ground conditions, using a construction method planned for this specific site.
Basement raft reinforcement and retaining wall formwork
02

Basement & retaining wall construction

The project included approximately 18,200 sq.ft. of basement area, including retaining wall works.

ExecutionExcavation, dewatering, reinforcement, formwork and concrete placement were carefully coordinated in the restricted space of the basement.
Expertise demonstratedBasement construction, retaining walls and RCC works in challenging site conditions.
All 5 blocks under construction at the same time, with the tower crane and batching plant
03

Multi-block construction

Building 5 blocks at the same time meant coordinating manpower, materials, machinery and several work fronts together.

SolutionThe team planned construction and allocated resources block by block. This kept work moving continuously and stopped work fronts from clashing.
Aluminium shuttering on the retaining wall
04

Fast-track construction & shuttering management

A key challenge was reaching the required construction speed across many floors.

Solution
  • Aluminium shuttering was used for repetitive structural work to raise speed and productivity.
  • Plywood shuttering was used for slabs and columns that needed more flexible, custom formwork.
ResultUsing both systems balanced speed, flexibility, quality and productivity.

Construction Journey

From waterlogged ground to a finished Core & Shell.

The team followed a clear sequence of steps, from excavation through to quality control and the finishing of the Core & Shell works.

  1. 01

    Excavation & dewatering

    The waterlogged ground was dewatered so excavation could go ahead safely.

    • Excavation
    • Dewatering
  2. 02

    Foundation

    Rubble soling gave a stable base for the RCC foundations.

    • Rubble soling
    • Foundation
    • Reinforcement
    • Formwork
    • RCC
  3. 03

    Basement & retaining wall

    About 18,200 sq.ft. of basement built in restricted conditions.

    • Basement
    • Retaining wall
  4. 04

    Superstructure, G + 12

    Floor-wise RCC across all 5 blocks, on a fast-track floor cycle.

    • Floor-wise structure
    • Aluminium shuttering
    • Plywood shuttering
  5. 05

    QC & Core & Shell completion

    Quality checks and finishing of the Core & Shell works.

    • Quality control
    • Core & Shell finishing

Aluminium shuttering for repetitive work and plywood shuttering for slabs and columns allowed faster construction cycles, while keeping the required quality and dimensional accuracy.

BlueWing's Expertise

The capabilities behind the delivery.

Foundation & difficult ground

  • Dewatering of waterlogged foundation areas
  • Foundation-bed preparation
  • Rubble soling
  • RCC foundation execution

Multi-storey RCC construction

  • 5-block construction management
  • Ground + 12-floor structural execution
  • Reinforcement, shuttering and concreting
  • Floor-cycle planning
  • High-volume RCC execution

Formwork expertise

  • Aluminium shuttering for fast-track construction
  • Plywood shuttering for slabs and columns
  • Formwork alignment, level and dimensional control
  • Efficient rotation and reuse of shuttering material

Basement & retaining walls

  • Approx. 18,200 sq.ft. basement execution
  • Retaining wall construction
  • RCC and reinforcement works
  • Safe working in restricted basement conditions

Project management

  • Manpower and material planning
  • Equipment coordination
  • Management of multiple work fronts
  • Consultant, client and multi-agency coordination

Quality & safety

  • Quality assurance and quality control
  • HSE and safety management
  • Dimensional accuracy across repetitive floors

Project Gallery

On site at Rameshwar Sky.

Rameshwar Sky: tower crane and batching plant across the site
Rameshwar Sky: dewatering the foundation area
Rameshwar Sky: basement raft reinforcement
Rameshwar Sky: excavation and rubble soling
Rameshwar Sky: aluminium shuttering on the retaining wall
Rameshwar Sky: completed blocks
Rameshwar Sky: footings, retaining wall and rubble soling
Rameshwar Sky: the bluewing site team
Rameshwar Sky: plywood shuttering for footings and columns
Rameshwar Sky: column reinforcement and formwork

Project Outcome

Delivered despite difficult ground and five work fronts at once.

The ground conditions were difficult and all 5 blocks were built at the same time. Even so, BlueWing completed the Core & Shell construction works.

The team's experience with waterlogged foundations, basement construction, RCC work, retaining walls and fast-track shuttering kept productivity high without compromising quality or safety.

Completed on 21 July 2025

Key Takeaway

Rameshwar Sky shows that BlueWing can deliver large multi-block, multi-storey Core & Shell projects, including difficult waterlogged foundation and basement works. Its use of dewatering, rubble soling, aluminium shuttering and plywood shuttering reflects practical construction skill, fast-track delivery and strong project management.

Work with BlueWing

Planning a multi-storey or multi-block project?

Talk to us about Core & Shell, turnkey and EPC construction.