Waterlogged foundation area
The basement foundation area was waterlogged, which made excavation and foundation preparation difficult.
Case Study · Core & Shell
BlueWing delivered the Core & Shell construction of this 5-block, multi-storey development. The work took in a waterlogged foundation, an 18,200 sq.ft. basement and fast-track structural work across G + 12 floors.
Project Overview
Rameshwar Sky is a 5-block multi-storey development. Each block has 1 basement, a ground floor and 12 upper floors, for a total built-up area of approximately 3.50 lakh sq.ft.
BlueWing Design and Construction Pvt. Ltd. carried out the Core & Shell construction works. This covered major RCC work, foundations, the basement, retaining walls, shuttering and structural construction.
The project needed careful planning, a fast-track construction method, good resource management, strict quality control and coordination across several work fronts at once.
Discuss a similar projectKey Project Challenges
Each challenge needed a solution suited to this site. The photos are from the site during construction.

The basement foundation area was waterlogged, which made excavation and foundation preparation difficult.

The project included approximately 18,200 sq.ft. of basement area, including retaining wall works.

Building 5 blocks at the same time meant coordinating manpower, materials, machinery and several work fronts together.

A key challenge was reaching the required construction speed across many floors.
Construction Journey
The team followed a clear sequence of steps, from excavation through to quality control and the finishing of the Core & Shell works.
The waterlogged ground was dewatered so excavation could go ahead safely.
Rubble soling gave a stable base for the RCC foundations.
About 18,200 sq.ft. of basement built in restricted conditions.
Floor-wise RCC across all 5 blocks, on a fast-track floor cycle.
Quality checks and finishing of the Core & Shell works.
Aluminium shuttering for repetitive work and plywood shuttering for slabs and columns allowed faster construction cycles, while keeping the required quality and dimensional accuracy.
BlueWing's Expertise
Project Gallery










Project Outcome
The ground conditions were difficult and all 5 blocks were built at the same time. Even so, BlueWing completed the Core & Shell construction works.
The team's experience with waterlogged foundations, basement construction, RCC work, retaining walls and fast-track shuttering kept productivity high without compromising quality or safety.
Completed on 21 July 2025Key Takeaway
Rameshwar Sky shows that BlueWing can deliver large multi-block, multi-storey Core & Shell projects, including difficult waterlogged foundation and basement works. Its use of dewatering, rubble soling, aluminium shuttering and plywood shuttering reflects practical construction skill, fast-track delivery and strong project management.
Work with BlueWing
Talk to us about Core & Shell, turnkey and EPC construction.